1 Engineer's Field Office 10 Month 2 Mobilization 1 Lump Sum 3 PREINVESTIGATION TELEVISE EXISTING SEWER 322 Foot 4 PROJECT SIGNS 2 Each 5 TRAFFIC CONTROL AND PROTECTION 235 Day 6 MAINTAIN EXISTING LIGHTING SYSTEM 1 Lump Sum 7 SEWER, 24", REINFORCED CONCRETE PIPE, CLASS III, IN OPEN CUT 72 Foot 8 SEWER, 48", REINFORCED CONCRETE PIPE, CLASS III, IN OPEN CUT 117 Foot 9 SEWER, 12' X 12', REINFORCED CONCRETE BOX CULVERT, IN OPEN CUT 876 Foot 10 SEWER, 12' X 6', REINFORCED CONCRETE BOX CULVERT, IN OPEN CUT 288 Foot 11 SEWER, 12", DUCTILE IRON PIPE, CLASS 52, IN OPEN CUT 10 Foot 12 SEWER, 24", DUCTILE IRON PIPE, CLASS 52, IN OPEN CUT 31 Foot 13 DRAIN CONNECTION, 6", DUCTILE IRON PIPE 18 Foot 14 DRAIN CONNECTION, 8", DUCTILE IRON PIPE 113 Foot 15 DRAIN 5 Foot