BUILDING DEMOLITION: 02.4106 001 Note: For fireproofing on steel, add 30% to the total cost. For salvage of steel, add 50% to the total cost. 02.4106 011 Frame building, single story 1 SF 3.75 3.75 1.31 5.06 02.4106 021 Frame building, two story 1 SF 3.63 3.63 1.27 4.90 02.4106 031 Frame building, three story 1 SF 3.55 3.55 1.24 4.79 02.4106 041 Concrete block building, 2 story, no concrete columns 1 SF 7.38 7.38 2.58 9.97 02.4106 051 Concrete block building, 3 story 1 SF 7.13 7.13 2.50 9.63 02.4106 061 Concrete building, monolithic, large 1 SF 8.33 8.33 2.92 11.24 02.4106 071 Concrete building, precast panel , frame roof 1 SF 7.64 7.64 2.67 10.31 02.4106 081 Steel frame building, no fireproof 1 SF 8.87 8.87 3.10 11.97 02.4107 000 CEILING REMOVAL: 1 02.4107 011 Remove ceiling, plaster/lath/frame 1 SF 1.89 1.89 .66 2.55 02.4107 021 Remove ceiling, plaster suspended grid 1 SF 1.42 1.42 .50 1.91 02.4107 031 Remove ceiling, acoustic suspended grid 1 SF .44 .44 .15 .59 02.4107 041 Remove ceiling, acoustic, salvage 1 SF .82 .82 .29 1.11 02.4107 051 Remove ceiling, area light, salvage 1 SF 1.53 1.53 .53 2.06 02.4107 061 Remove ceiling, tile, 12" x 12" 1 SF 1.07 1.07 .37 1.44