Removal and reconstruction work shall be accomplished in accordance with the construction documents and shall include but is not limited to the following: 1. Removing existing pavement and excavating. Hauling and legally disposing of existing pavement and surplus materials from the project site. 2. Constructing new concrete curbs or curbs and gutters. 3. Constructing asphaltic concrete pavement or Portland cement concrete pavement. 4. Replacing concrete sidewalks and driveway aprons. 5. Constructing concrete handicap ramps. 6. Other work incidental to the project. 7. Pavement striping 8. This work shall primarily be within the airfield on runways, taxiways and aprons which is referred to as AIRSIDE. However, it will also be on other NOAB property outside the fence line to include our cargo roads, access road(s), and other public areas and referred to as LANDSIDE. However, some repairs within the fence line, such as those on the Perimeter Road, will be handled as if they were LANDSIDE, or as non-FAA regulated pavements.