Part 1: Overall Site Development Plans • Dumpster and Clubhouse Area • New Kiosk Area • General Civil/Site Work Associated with Dam Reconstruction • Pavement Rehabilitation • New Hope Road Improvements Part 2: Maintenance Plan for Sandalwood Lake consisting of dredging, silt removal, and shoreline improvements. • Drainage and lowering the lake as needed to complete removal of accumulate silt, sediment and debris and soil along with grading of the lake side slopes. • Installation of erosion control and BMPs. • Traffic control. • Removal of silt, debris, and soil off the site. • Grading of side slopes and shoreline per contractor drawings. • Installation of grassing/mulch and erosion blanket as shown on the drawings. • All work shall comply with all federal, state and local requirements and specifications. • Traffic control is to be provided by the contractor.