Provide engineering design services and assistance during bidding and construction generally related to the demolition of two existing (0.3 MG and 0.2 MG) potable water storage tanks, construction of a single new 1.6 MG raw water storage tank at the same location, associated pipeline work, and technical analysis. This project is funded by a Community Development Block Grant (Contract No. 18-MIT-RIP 23001). It is the intent of the City to hire a single qualified Consultant team that can provide the following services to the City: • Project Management; • Preliminary Engineering Design; • Environmental Compliance and Permitting; • Plans, Specifications, and Estimates (Final Design); and • Assistance during Bidding and Construction, excluding Construction Management and Inspection.