a. Maintenance Control Program (MCP) - A written Maintenance Control Program for each unit shall be provided by Elevator Service Provider to maintain each elevator in compliance with ASME A17.1-2016 requirement 8.6 and shall be located in the machine room or control room and viewable on-site by any elevator personnel at all times. b. The MCP shall include, but not be limited to, the Code required maintenance tasks, maintenance procedures, and examinations and tests list with the associated requirement (see 8.6.4 through 8.6.11). Where maintenance tasks, maintenance procedures, or examinations or tests have been revised in 8.6, the MCP shall be updated by Elevator Service Provider. c. The MCP shall reference On-Site Documentation (see 8.6.1.2.2) and On-Site Maintenance Records (see 8.6.1.4.1) that record the completion of all associated maintenance tasks specified in 8.6.1.4.1(a).