WIDEN, RESURFACE AND RECONSTRUCTION OF EXISTING ASPHALT STREETS TO TRUCK ROUTE STANDARDS; CONSTRUCT CURB & GUTTER (33' FACE TO FACE OF CURB); CONSTRUCT STORM SEWERS & REGIONAL DETENTION POND; AND INSTALL PEDESTRIAN CROSSWALKS, SIGNALS & SIDEWALKS AT THE INTERSECTION OF RTE. 23. MAJOR ITEMS: EARTH EXCAVATION 19,900 CU.YD., TOPSOIL 23,800 SQ.YD., STORM SEWERS 10" - 36" 6,400 FT., MANHOLES 34 EA., INLETS 65 EA., AGG. BSE. 4,350 TON, P.C.C. BSE. CSE. 2,350 SQ.YD., P.C.C. DRIVES & SIDEWALKS 3,050 SQ.YD., HMA SURF. REM. 5,800 SQ.YD., HMA BSE. CSE. 4" 5,920 SQ.YD., HMA BINDER, SURF. & INCIDENTAL 4,675 TON, CONC. CURB & GUTTER 11,555 FT., PAV'T MARKING 11,575 FT., ELECTRICAL CABLE & CONDUCTOR 3,300 FT., PEDESTRIAN SIG. HEAD & PUSH BUTTONS 11 EA.