The scope of the project is summarized as the construction of paving and drainage improvements to the cul-de-sac of Riverside Road and along Eastwind Drive. Portions of the cul-de-sac of Riverside Road do not currently properly drain, and there are steep slopes on two driveways that need to be corrected. Scope of work will include demolition and removal of the existing asphalt in the area, removing unsuitable materials, installing drainage system, backfilling, and re-paving. Associated sidewalk and swale improvements will also be involved. Portions of the Eastwind Drive do not currently properly drain. Scope of work will include milling and resurfacing, demolition and removal of the existing asphalt in the indicated areas, removing unsuitable materials, installing drainage system, backfilling, and re-paving. Associated sidewalk and ADA improvements will also be involved.