1.01 MOBILIZATION AND DEMOBILIZATION 1 LS $ $ 1.02 SURVEYING AND RECORD DRAWINGS 1 LS $ $ 1.03 TEMPORARY EROSION AND SEDIEMENT CONTROL 1 LS $ $ 1.04 REMOVAL OF FOUNDATION (CONCRETE CURB WALL, TIMBER CRIB WALL) 160 LF $ $ 1.05 REMOVAL OF PERMEABLE BRICK PAVERS 2,780 SF $ $ 1.06 EXCAVATE SUBGRADE SOIL (ALLOWANCE) 650 CY $ $ 1.07 DISPOSAL OF UNSUITABLE OR EXCESS SUBGRADE SOIL (ALLOWANCE) 750 TON $ $ 2.01 PLACE GEOBAG SAND 1 LS $ $ 2.02 PROCURE AND PLACE BEACH NOURISHMENT MATERIAL (ALLOWANCE) 4,325 CY $ $ 2.03 PROCURE AND PLACE DUNE COIR MATTING 1,160 SY $ $ 2.04 REMOVE AND REPLACE LARGE WOOD 1 LS 3.01 DEMOLISH AND DISPOSE OF CONCRETE RUBBLE AND SHORELINE DEBRIS 12 TON $ $ 3.02 DEMOLISH AND DISPOSE OF ARMOR ROCK (ALLOWANCE) 170 TON $ $ 3.03 DEMOLISH AND RE-PLACE ARMOR ROCK (ALLOWANCE) 350 CY $ $ 3.04 PROCURE AND PLACE FILTER ROCK 220 CY $ $ 3.05 PROCURE AND PLACE ARMOR ROCK 530 CY $ $