a) All traffic lines painted shall conform to the New York State Manual of Uniform Traffic Control Devices, about color, width and spacing of lines. The painted traffic lines shall follow the centerline of the road; they shall be straight and true on tangents and uniform on curves. b) All traffic lines shall be sharp, well defined, and retroreflective. Line widths shall be within 1/4”ofthewidthsspecified. The Contractor shall be responsible for the one hundred percent(100%)reflectorizing of all traffic lines. Should the painted lines not receive enough beads for the reflectorizing required, or should fuzzy lines, excessive overspray or non-uniform application result, the Contractor shall be responsible for removing the rejected work and reapplying the markings at no cost to the City. c) Edge line striping shall be performed while the striping machine is traveling upon the pavement surface. At no time is it to travel upon the shoulder. Centerlines and edge lines are not to be painted simultaneously. Edge lines may vary and therefore must be re-traced by guiding off the right side of the applicator machine...