A1 Mobilization / Bonds / Insurance LS 1 $ $ A2 Traffic Control LS 1 $ $ A3 Utility Adjustment LS 1 $ $ A4 SWPP (Erosion Control Log) LF 112 $ $ A5 Remove Existing Street Asphalt SY 2,860 $ $ A6 Mill Existing Street Asphalt SY 1,724 $ $ A7 Remove Existing Curb LF 780 $ $ A8 Remove Existing Curb & Gutter LF 468 $ $ A9 Remove Existing Sidewalk Concrete SY 85 $ $ A10 Remove Existing Concrete Valley Gutter SY 209 $ $ A11 Remove Existing Concrete SY 12 $ $ A12 Remove Existing Concrete Rip Rap SY 12 $ $ A13 H.M.A.C. Pavement SY 2,735 $ $ A14 Asphalt Repair SY 884 $ $ A15 Overlay Milled Asphalt SY 1,724 $ $ A16 Repair Existing Curb & Gutter LF 432 $ $ A17 Repair Existing Sidewalk Concrete SY 67 $ $ A18 5’ Concrete Valley Gutter LF 47 $ $ A19 Curb Inlet EA 14 $ $ A20 Junction Box Type ‘A’ EA 11 $ $ A21 Grate Inlet EA 4 $ $ A22 12”Ø RCP Class V LF 662 $ $ A23 24”Ø RCP Class V LF 1,934 $ $ A24 6’x1’ RCB LF 371 $ $ A25 Waste Water Line Crossing EA 1 $ $ A26 ADA Parallel Curb Ramp EA 1 $ $ A27 ADA Perpendicular Curb Ramp EA 1 $ $ A28 Concrete Apron SY 18 $ $ A29 Repair Existing Concrete SY 12 $ $ A30 Repair Existing Concrete Rip Rap SY 12 $ $