104- 10 SEDIMENT BARRIER £ 50 LF 104- 10 SEDIMENT BARRIER > 50 LF 104- 11 TURBIDITY BARRIER, FLOATING £ 50 LF 104- 11 TURBIDITY BARRIER, FLOATING > 50 LF 110- 1-1 CLEARING & GRUBBING £ 0.25 AC 110- 1-1 CLEARING & GRUBBING > 0.25 AC 110- 73 REMOVE EXISTING BULKHEAD £ 20 LF 110- 73 REMOVE EXISTING BULKHEAD 20 - 100 LF 110- 73 REMOVE EXISTING BULKHEAD > 100 LF 120- 6 EMBANKMENT £ 10 CY 120- 6 EMBANKMENT > 10 CY 121- 70-2 FLOWABLE FILL £ 10 CY 121- 70-2 FLOWABLE FILL 10 - 50 CY 121- 70-2 FLOWABLE FILL > 50 CY 125 - 1 EXCAVATION, FOR STRUCTURES £ 10 CY 125 - 1 EXCAVATION, FOR STRUCTURES > 10 CY 400 - 2 - 8 CONCRETE CLASS II, BULKHEAD £ 5 CY 400 - 2-8 CONCRETE CLASS II, BULKHEAD 5 - 25 CY 400 - 2 - 8 CONCRETE CLASS II, BULKHEAD > 25 CY 400 - 4 - 8 CONCRETE CLASS IV, BULKHEAD £ 5 CY 400 - 4 - 8 CONCRETE CLASS IV, BULKHEAD 5 - 25 CY 400 - 4 - 8 CONCRETE CLASS IV, BULKHEAD > 25 CY