Scope of work toprimarily include the following: Baggage Handling System (BHS) Contractor to supply & install inbound and outbound BHS. Outbound shall include multiple powered conveyors, roller conveyors, liftgate, security doors, MCP panels and impact protection. Inbound shall include a single flat plate claim device. These shall be installed in both secure and public areas. BHS contractor to install and program BHS controls to operate the system. BHS contractor shall coordinate all electrical power requirements with the Construction Manager at Risk (CMAR) for the Terminal Building. BHS Contractor and CMAR shall coordinate installation with TSA for integration of EDS machine. BHS Contractor shall install BHS in the new terminal at the location shown in the contract documents dated June 2, 2025. The BHS is specified in the Project Manual dated June 2, 2025. BHS will require certification to confirm compliance with FAA Buy American Preference.