Well 15 drilling, installation, and testing Well 15R drilling, installation, and testing Vertical turbine well pump with sounding tubes for water level measurement Variable frequency drive for Well 15 Reverse Voltage Soft Start (RVSS) motor for Well 15R Conversion of existing Well 15 to a monitor well Piping from the existing distribution line to each well Pump to Waste piping from each well Down Hole Flow Control Valve Water flush lubrication system Ancillary equipment related to well controls Instrumentation and connections to Supervisory Control and Data Acquisition (SCADA) system for a fully automated well Electrical power for all new equipment Piping to existing raw water pipeline to water plant A CMU building which will house an electrical room Each site will also be graded to accommodate storm water conveyance to existing retention basins at the plant