PRIORITY 1 BATHROOM SHOWER REMODEL: Replace existing shower with roll‑in shower with ceramic tile surround. Remove all existing wall material from existing walls around bathtub area. Expose wood studs and notify CDD Inspection team if wall studs are damaged or rotted prior to replacement. Add 2x10 supports to the opened wall for handicap hand railings on the two sides and lateral handicap bar on showers supply side to support a hand held shower slide bar. The contractor is to remove the subfloor under the shower and notch existing floor joists to the desired depth for new 3/4" subfloor replacement with construction adhesive and water resitant fasteners. Cut joists may require sistering of additional support to the sides of the joists with 3" nails. The contractor is to use waterproof membrane properly installed to the main bath flooring per manufacturer's installation requirements. All shower walls are to be covered with mildew resistant drywall and waterproofed with Schluter wall membrane and required thinset. All intersecting joints to be overlapped with required lap joints. The contractor shall reframe the shower base subflooring to allow proper drainage for roll‑in shower. The drain will need to be relocated to fit the new 36" linear drain body, properly sloped for removal of all standing water. The contractor shall install a new teak and stainless steel folding bench properly blocked and mechanically fastened to the extrior wall of the shower. USE: 36 in. Stainless Steel Linear Shower Drain with Tile‑In Pattern Drain Cover. Kerdi Schluter presloped shower base cut to fit existing opening, Kerdi Schluter wall membrane and overlap, and local suppliers for other required materials. Install ceramic tile (12x24‑$2‑3.50sqft) and wall niche from Schluter tiled in matching color as chosen by the home owner. Install with thin set mortar. Grout wall with latex‑Portland grout and apply mildew resistant caulk to all seams, fixtures and pipe penetrations. All tile and grout work must be properly sealed after installation. Contractor shall supply and install a grab bars with a gripping width