3.1.1 ASSESSMENT FEE: 3.1.1.1 Vendor may charge an initial, one-time “Assessment Fee” to the agency to help cover the cost of the initial on-site visit. 3.1.1.2 This fee may only be charged for the initial (one-time) on-site visit/assessment. 3.1.1.2.1 Assessment Fee will not be charged for follow-up visits if needed. 3.1.2 Stripping, Removal, Encapsulation, Disposal, and Wet Cleaning, in compliance with all applicable laws, regulations, and ordinances. 3.1.3 Sealing all surfaces from which ACM or suspected ACM was removed and sealing of all exposed edges of any remaining ACM that is to remain in place. 3.1.4 HEPA vacuuming and Wet Cleaning all surfaces inside and outside of the Enclosed Work Area as needed. 3.1.5 Ensuring that the worksite is properly maintained to protect public safety. 3.1.6 Insulating and fireproofing various structures from which ACM has been sealed or removed. 3.1.7 Restoration of all property, private or public, affected by Abatement Services to its original condition or better. 3.1.8 Providing clearance reports, final reports, and project manuals that include descriptions of work in all locations, waste manifests signed by landfill representatives, and all other documents related to this project. 3.1.9 Any other task required by the West Virginia Department of Environmental Protection and Department of Health and Human Resources Asbestos Compliance Division to properly provide Abatement Services.