1 105 CONSTRUCTION ENGINEERING 1 LS 2 TP1 SPECIAL RIGHT-OF-WAY CONDITIONS 1 LS $50,000.00 $50,000.00 3 110 MOBILIZATION AND DEMOBILIZATION (5% MAX) 1 LS 4 201 CLEARING RIGHT-OF-WAY 1 LS 5 202 PRESENT STRUCTURE, REMOVE PORTIONS 1 LS 6 203 EXCAVATION, COMMON 320 CYS 7 203 BORROW 15 CYS 8 205 STORM WATER MANAGEMENT BUDGET 12,000 DOL $1.00 $12,000.00 9 205 STORM WATER MANAGEMENT IMPLEMENTATION 1 LS 10 206 EXCAVATION, FOUNDATION, UNCLASSIFIED 28 CYS 11 206 COFFERDAM 1 LS 12 207 SUBGRADE TREATMENT, TYPE IC 384 SYS 13 211 AGGREGATE FOR END BENT BACKFILL 28 CYS 14 214 GEOTEXTILE FOR PAVEMENT, TYPE 2B 518 SYS 15 302 SUBBASE FOR PCCP 34 CYS 16 303 COMPACTED AGGREGATE NO. 53 28 TON 17 306 MILLING, TRANSITION 251 SYS 18 401 QC/QA-HMA, 3, 58S, SURFACE, 9.5 MM 49 TON 19 401 QC/QA-HMA, 3, 58S, INTERMEDIATE, 19.0 MM 46 TON 20 401 QC/QA-HMA, 3, 58S, BASE, 25.0 MM 109 TON