Sealed proposals are requested by the San Antonio Water System for the demolition of the existing pump station and associated equipment, as well as the construction and installation of a 550,000-gallon Type III prestressed concrete ground storage tank, a 3.0 MG booster station, a 15,000-gallon hydro-pneumatic tank, yard piping and valves, a control valve assembly, an electrical and I&C building, a pump station canopy, site grading and restoration, site fencing, electrical and instrumentation and controls (I&C) system upgrades related to the new facility, and miscellaneous civil site improvements, including fencing, lighting, and a new access driveway, for the Silver Mountain Pump Station Upgrades Project, SAWS Job No. 22-601