Mobilization and layout Installation and maintenance of Phase 2 and Phase 3 erosion control measures, including NPDES monitoring Fine grading and earthwork for the project Concrete apron and 4' wide concrete flume under sidewalk ADA-compliant handicap ramps with tactile warning tiles Installation of curb and gutter and sidewalk Placement of thermoplastic striping and roadway signage Construction of a concrete island and setup of traffic message boards Paving section includes: 12" graded aggregate base 6" 25MM binder 2" 19MM intermediate layer 1.25" 9.5MM surface layer with lime Mill and overlay of existing SR 16 tie-in areas Temporary striping and final thermoplastic striping Traffic control including signage, message boards, and maintenance of traffic Saw cutting and installation of storm drainage infrastructure associated with the entrance