The BP-2 base bid scope is to provide and install custom modular stalls and interlocking rubber mats for Barn A (100 stalls and mats). There will be three alternates part of BP-2. Alternate 1 will be to provide and install custom modular stalls and interlocking rubber mats for Barn B (100 stalls and mats). Alternate 2 will be to provide and install custom modular stalls and interlocking rubber mats for Barn I (84 stalls and mats). Alternate 3 will be to provide and install custom modular stalls and interlocking rubber mats for Barn J (100 stalls and mats). The BP-2 General Contractor is responsible for coordinating with the BP-1 General Contractor for scheduling and installation of the new custom modular stalls and mats. The schedules for both BP-1 and BP-2 are the same, as it is intended the BP-1 General Contractor will provide access for the installation of the custom modular stalls and mats during the construction period, so that both bid packs can achieve Substantial Completion at the same time.