1) TIA Project PI# 0018682 Approximately 10 miles of a combination of asphalt widening and resurfacing on Old Macon Road. More specifically widen 5.5 miles of the Old Macon Road where delineated, 2' on each side, with 19mm asphalt @ 440lbs per SY and resurface complete 10 miles of roadway with 12.5mm asphalt @ 165 lbs. per SY beginning at intersection of Hwy 80 and ending at County Line. An interlayer course consisting of #7 stone at a rate of 25lbs per SY shall be placed on the approximately 2,70 mile section between Hwy 80 and Hwy 338. - Approximately 2840 tons of 19mm asphalt - Approximately 11,616 tons of 12.5mm asphalt - Approximately 38,145 SY of #7 Interlayer Course - 5" Center and edge line striping. Edge line striping should be one and a half feet off edge of pavement.