• The building size is 43’ x 66.6’ +/- • The building is in 3 sections - 15 ft. each. • Original building location and new location are noted in attached map, Exhibit F. • Contractor will need to supply a mover for the relocation of building to a new location across from the current HIP building. • Once the building is relocated, the contractor needs to ensure the entry door is facing the street. • For current location of modular, the contractor will need to disconnect waterline and cap at existing water meter, disconnect sewer line and cap below ground, electricity needs to be removed back to meter, if existing communications are present then remove back to pole or nearest supply box. • At the current location the building is sitting on ribbon footing and cinder blocks. • For the new site location, the contractor shall assess the existing ground conditions and include in their proposal any recommended sub-grade preparation necessary to ensure proper placement and long-term stability of the modular unit. • At current location, the contractor will remove metal siding and vents to salvage for reuse in new location or replace if needed. • The Contractor will provide a cost proposal to install handicap access ramp at front door (North side) and install new landing and stairway at additional entry doors. Because the doors are close together, one landing and one stairway may be feasible. • The gates to the existing location of the modular are approximately 16 – 17’ wide. If while relocating building sections the existing fence at current location is removed, then the contractor will be responsible for any removal and replacement of the fence and/or gate. The fence is welded metal. • Contractor removal of modular needs to be completed by disassembling three sections of the building. If additional materials are needed to reconnect, the contractor will provide such materials as needed to ensure the building is operational at a new location. • Once they have moved the modular unit to the new location, the contractor needs to verify that exterior walls and roof are weatherproof and provide necessary materials to do so. • The Contractor will need to disconnect ceiling grid from section walls in the interior of the building before moving to new location. • The Contractor will need to reconnect all ceiling grids in the interior of the building.