Materials: A. Steady Stride Woodgrains LVT or equivalent. B. Duracove 4 ½ inch or equivalent. 7. Flooring Removal: A. Remove all existing furniture in preparation for the flooring replacement. B. Prepare worksite to prevent any damages to existing walls, ceiling, floor, other equipment, etc. Contractor at no expense to the CHP, shall repair all damages caused by the contractor, contractor’s subs and/or vendors. C.Remove all current vinyl tiles and carpeting. D. Ensure that all flooring materials are properly removed and disposed of. E. Ensure all cracks and gaps are filled, sanded, and leveled for application of vinyl tile using a Portland based leveling compound. F. All work to be done in accordance with the manufacturer’s recommended procedures. 8. Contractor to comply with the following: A. Supply and deliver boxes, carts and labels at least one (1) week prior to start of the project. B. Provide 10 computer carts. C. Each phase to be conducted during non-business hours. D. Relocate furniture and related boxes to an area designated by CHP. Exception: CHP to relocate all computers and raise modular furniture for carpet removal and flooring installation.