The Project will include a storm drainage component. The absence of a stormwater connection for Classic Street leads to flooding and erosion issues on what has become a critical transportation connection. Flooding not only poses a safety hazard for drivers and pedestrians, but it also hinders the overall functionality and longevity of the travel way. The construction of a stormwater system will allow the current storm basin to flow in two separate directions and connect to the recently completed storm line constructed in Dorcas Lane, which intersects Classic Street. The stormwater element of the Project will require retaining walls on the western side of Classic Street to allow for proper grading and to ensure long-term roadway stability. 1. MOBILIZATION LS 1 $ $ 2. TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC LS 1 $ $ 3. EROSION AND SEDIMENT CONTROL LS 1 $ $ 4. CLEARING AND GRUBBING AC 0.15 $ $ 5. ASPHALT PAVEMENT SAWCUTTING LF 650 $ $ 6. SALVAGE AND REINSTALL HYDRANT EA 1 $ $ 7. REMOVAL OF PAVEMENT, AC/PCC (INCLUDING HAUL) SY 2300 $ $ 8. REMOVAL OF WALK SY 31 $ $ 9. REMOVAL OF CURBS LF 220 $ $ 10. REMOVE OR PLUG-FILL AND ABANDON EXISTING PIPE (WATER) LF 300 $ $ 11. REMOVAL OF PIPE (STORM SEWER) LF 350 $ $ 12. REMOVAL OF STRUCTURES (STORM SEWER, CB ONLY) EA 8 $ $ 13. SALVAGE EXISTING SIGNS LS 1 $ $ 14. GENERAL EXCAVATION CY 750 $ $ 15. TOPSOIL (SEEDED AREA) CY 130 $ $