The project consists of work on 2 separate buildings. The scope of work at the Main Kitchen building consists of the existing shingle roof removal down to the deck and the installation of a new standing seam metal panel roof system. New gutters & downspouts are required as noted. The scope of work at the Connector Building consists of the complete removal of the existing ballasted EPDM membrane roof, down to the metal roof deck, and the installation of a new insulated 2-ply mod-bit (cold application over hot application) roof system on 4 separate roof areas. New pre-finished metal coping caps are specified for 2 of the areas. New gutters & downspouts are specified for one of the roof areas, the others drain via scupper drains. EIFS repairs to be performed as noted.