Construct 2025 HMA Street Improvements including approximately 12,239 square yards of HMA surfacing, 1,852 square yards of machine milling, roadway widening, culvert replacement, base stabilization, patching, and seeding/fertilizer are required including miscellaneous associated work including cleanup. The streets included in the HMA Surfacing construction program include the following: A. Douglas Court (approximately 968 square yards) HMA overlay and 22.5 square yards HMA widening. B. N. 7th Street, localized section between Wisconsin Street and Jones Street (approximately 423 square yards) HMA mill and overlay. C. N. 10th Street, Wisconsin Street to Reynolds Street (approximately 1,516 square yards) HMA overlay and 184 square yards HMA widening. D. N. 11th Street, Jones Street to Reynolds Street (approximately 940 square yards) HMA overlay.