Removal of Material. The successful bidder shall remove all rubbish and waste resulting from the demolition work. The bidder shall use an approved dumpsite for depositing of all inert materials. Refer to page 57 of the site plan as portions of the fencing must remain as they are with the neighboring property. 3.2.3 Site Conditions. At the end of each work day, the Contractor shall leave the premises in such condition that it will not constitute a public nuisance or hazard. This shall include removing debris from public streets, alleys, terraces, and sidewalks that are open to the public 3.2.4 Site Demolition. The Contractor shall provide all labor, materials, equipment, and supplies necessary to complete all items as described below. Any damage to property outside of what has been described in these specifications shall be restored to its original state or as directed by the Engineer, at the Contractors expense.