1. The MDF / server room in the facility will be the central point for all data/voice terminations to rack-mounted patch panels. 2. A fiber cable will be run through the supplied conduit from the Server Room to the (2) pedestals for the barrier arm gates. 3. The demarcation point for all building utilities will be the server room, room # 108. 4. Installation of cable support systems throughout building. (J-hooks or cable tray). 5. All cabling must be CAT 6. 6. All jacks to be T568B wiring scheme. 7. All racks to be 6’ with wire management. 8. Racks will include space and available termination points for at least 25% future cable drops. 9. All terminating backboards, patch panels, connecting cable, patch cords, wire management rings and trays, ladder racks labeling, racks, and any and all other hardware necessary will be provided by the Contractor. 10. Patch panels installed, populated and with patch cables included