1. The Contractor shall convert the sand vac filters (current filtration system) into an additional surge tank, that will serve as the holding tank for water coming from the pool prior to entering new horizontal Neptune Benson sand filters. 2. The Contractor shall remove any media, laterals, and debris from current filter pits to the prep area. 3. The Contractor shall core hole into the pits to run new plumbing in and out. 4. The current existing 25hp motor will be re-plumbed and positioned to discharge into pits. A new motor is not included in this scope or work. 5. The Contractor shall install a new strainer pot in front of the suction side of the 25 hp motor. A strainer will help keep debris out of the impeller, pump, and filter for easy service and cleaning. 6. New horizontal sand filters will be placed on new concrete pads, above ground. These filters will be easily accessible for backwash and maintenance, such as media changes. 7. The Contractor shall plumb return piping to the pool. 8. The Contractor shall provide start up on all equipment upon completion of installation and provide a 2-hour training for staff.