1. Construction staking and other construction engineering required to control the work. 2. Erosion and sedimentation control construction. 3. Temporary groundwater control. 4. Site preparation, including stripping and undercutting unsuitable subgrade soils, demolition, and removal from the project lands of materials not to be used for construction. 5. Site grading, including excavation, filling, compaction, and preparation of subgrades for paving. Site grading includes importing material, stockpiling and hauling from stockpiles, and other work necessary to construct embankments and excavations as shown and specified. 6. Construction of building pads and staging areas. 7. Coordination of temporary utilities. 8. Installation of the complete site drainage system complete, including building roof drain laterals. 9. Installation of the complete water distribution and sanitary sewer system complete, including service laterals. 10. Construction of curbs. 11. Construction of paving. 12. Striping and traffic control. 13. Backfilling curbs and islands with approved soils for planting. 14. Backfilling walls. 15. Installation and coordination of temporary warning signs, directional signs, barricades and fences required to direct, control and protect the public throughout the construction period. 16. Coordination of installation of light poles, irrigation systems, and associated conduits.