The County anticipates the following scope will be included: o Conduct a detailed load study to identify the need for backup power. o Determination of the necessary generator capacity. o Provide recommendations on features and requirements of the units that will be included in the project specifications. o Adhere to County standards regarding generator equipment and features such as transfer switches, quick connections, and remote monitoring. o Consider the location and accessibility of the unit to ensure that it will be accessible for refueling, maintenance, and ventilation. o Ensure that the generator can be installed and connected to the electrical panel safely and in compliance with local codes and regulations, and that the ADC maintains compliance with TCJS standards throughout construction.