1 202(A) UNCLASSIFIED EXCAVATION CY 409 $0.00 2 220 SWPPP DOCUMENTATION AND MANAGEMENT LSUM 1 $0.00 3 230(A) SOLID SLAB SODDING SY 72 $0.00 4 303(A) AGGREGATE BASE TYPE A CY 335 $0.00 5 310(B) SUBGRADE METHOD B SY 1016 $0.00 6 COT 318 VALVES BOXES EA 3 $0.00 7 325 SEPARATOR FABRIC SY 2708 $0.00 8 409(A) FABRIC REINFORCEMENT (TENSAR GP25, OR APPROVED EQUAL) SY 28846 $0.00 9 411(C) SUPERPAVE, TYPE S4 (PG 64-22) TON 3229 $0.00 10 411(E) SUPERPAVE, TYPE S6 (PG 64-22) TON 267 $0.00 11 412 COLD MILLING PAVEMENT SY 14490 $0.00 12 COT 608(A) GROUND SIGN SF 170 $0.00 13 COT 608(C) 1-1/2" SQUARE TUBE POST LF 6 $0.00 14 COT 608(D) 1-3/4" SQUARE TUBE POST LF 410 $0.00 15 COT 608(E) 2" SQUARE TUBE POST LF 126 $0.00 16 609(B) COMBINED CURB AND GUTTER (6" BARRIER) LF 217 $0.00 17 612(E) VALVE BOXES ADJUST TO GRADE (REIN. CONC. COLLAR) EA 10 $0.00 18 612(M) REMOVE & RESET MANHOLE FRAME & COVER (REIN. CONC. COLLAR) EA 21 $0.00 19 619(B) REMOVAL OF CURB AND GUTTER LF 217 $0.00 20 641 MOBILIZATION EA 1 $0.00