1. Maintenance and Protection of Traffic approximately 1 L.S. 2. Hot Mix Asphalt 19M64 Base Course, 7” Thick, approximately 449 Tons 3. Hot Mix Asphalt Driveway, 3” Thick, approximately 20 S.Y. 4. 6” HDPE Pipe, Type N12, approximately 104 L.F. 5. 10” Perforated HDPE Underdrain Pipe, Type “P”, approximately 84 L.F. 6. Sump Pump Connection with Cleanout Assembly, approximately 3 Units 7. Sump Pump Connection without Cleanout Assembly, approximately 1 Unit 8. Bicycle Safe Grate, approximately 3 Units 9. Curb Piece, approximately 3 Units 10. Reconstructed Inlet, Type “A”, using existing casting, approximately 1 Unit 11. Reset Inlet Casting, approximately 1 Unit 12. Reset Manhole, approximately 1 Unit 13. Concrete Sidewalk, 4” Thick, approximately 215 S.Y. 14. Concrete Sidewalk, Reinforced, 6” Thick, if and where directed, approximately 20 S.Y. 15. Concrete Driveway, Reinforced, 6” Thick, approximately 650 S.Y. 16. Detectable Warning Surface, approximately 16 S.Y. 17. 6”x8”x18” Concrete Vertical Curb, approximately 6,865 L.F. 18. Paint No-Parking Zones (Yellow Curb), approximately 80 L.F. 19. Tree Removal, over 18” to 24” Diameter, if and where directed, approximately, 1 Unit 20. Take soil erosion protection measures, if and where required, during the course of construction