These bids shall cover all the furnishing of all labor, material, equipment, mechanical workmanship, transportation and services which are required for Diablo Road Pedestrian Trail and Drainage Improvements Project, Contract No. C-055. The work generally includes, but is not limited to, removal of trees, minor regrading, construction of a pedestrian/cycle trail, installation of hot mix asphalt, construction of drainage improvements including concrete vditches, drainage pipes, and inlets, installation of bioretention areas, traffic control, tree replacement planting, wildlife exclusion and cattle fencing, a drinking fountain and signs and other items that are required by the plans, standard specifications, or these Special Provisions.