Bid is intended as a price and qualifications contract award to remove and replace a portion of the existing 6-inch tipping floor wear topping course at the City of Rocky Mount Solid Waste Regional Transfer Station as detailed on the Appian Consulting Engineers Plan titled, “Point Cloud Slab Elevation Analysis Floor Wear Inspection 2/12/2025”. The concept provided and specified herein assumes, based on research conducted by Appian Consulting Engineers, PA and proven performance of the existing wear course installed in 2014, that the most economical system with proven performance/life span in the range of 10+ years will consist of a 6-inch wear topping course comprised of a proprietary blend of Portland cement, dense aggregate and other additives that will enable the mix to attain the desired strength, density, air content, etc. and provide the desired longevity and wear resistance.