The work shall include all of the equipment and material necessary to perform this task in accordance with the requirements of the Village of Ridgewood, New Jersey 07450 as needed and described in the bid documents. The work is located at the Eastside Reservoir site, across from 425 E. Saddle River Road, Ridgewood, NJ. The work generally consists of construction of a new PFAS treatment facility containing two (2) 10-foot diameter granular activated carbon (GAC) vessels, a new backwash holding tank, a stormwater detention system, new chemical feed systems, construction of a new masonry building with a residential-style façade, and all electrical, instrumentation, process piping, mechanical, plumbing and site work shown on the contract documents. The project also includes installation of 6-inch raw water main from the East Saddle River well and Salem well.