The work consists of special clearing, excavation, stockpiling, construction of two weirs, the maintenance road, rip-rap and plantings for an approximately 2.3-milelong flow-way in accordance with the plans that were prepared by AIM Engineering & Surveying, Inc., which may include, but are not limited to: • Maintenance of Traffic • Surveying (Property line identification, construction staking, and surveyed asbuilt drawings) • Landscape Plantings • Asphalt turnout construction • Clearing and grubbing, including exotic vegetation removal and disposal of all materials generated and disposed of at a proper disposal site • Excavation and Stockpiling • Sheet Pile & Concrete Cap Water Control Structures (Weirs) • Maintenance Road constructed of stabilized subgrade • Bank & Shore and Ditch Lining rip-rap • Barbed-wire fencing removal and installation, tube gates, and guardrail relocation • Testing • Pipe removal and installation • Utility coordination if any • Grassing by seed & mulch, sod and other erosion control measures as required • Complete restoration of construction site • Secure necessary paperwork to access private property when needed • Permits • As-built survey