1. Remove and Dispose of Existing turf 2. Remove and dispose of approximately 75% of existing fence post. 3. Remove and save approximately 75% of existing fence mesh. 4. Fence and post on concrete area around and behind fieldhouse to stay as is. 5. Remove track and field pits at west end of field and prepare for turf 6. Prepare existing base for instillation of new turf. Minor grading may be needed in certain areas. 7. Install new synthetic turf slit-film or dual fiber(slit-film/monofilament) with a sand and rubber infill system or approved equal system. Must be able to provide a minimum 1-year warranty. For reference this field will be mainly used by youth football players 6 to 12 years old. It could occasionally host soccer or Lacrosse up to 18 years old as well but on a limited basis. 8. Provide an add alternate for cooling fill system as well. 9. Laydown area for materials and equipment will be available on-site. 10.Include football (AHSAA specs), soccer and lacrosse markings on new installation. Soccer and Lacrosse markings may be modified to fit in the project area. Markings need to be different colors accept where lines intersect and are the same boundary for multiple sports (in those areas white will be the default). (Football-White, Soccer-yellow, Lacrosse-TBA) 11. 3 Logos will be required. Midfield Large Logo (2 color minimum Spear to mirror THS field), 25-yard line southwest small logo (1 color-white city logo), 25-yard line southeast small logo (1 color-white city logo). 12. FB endzones to be Black with WARRIORS (2 color Red/White) in both East and West endzone.