This project consists of replacement of an existing library. The work includes demolition of a 13,500 SF single story building and construction of a new 19,000 SF single story library and a 94,000 SF three-story parking garage at the same location. The new facility is designed to meet LEED Gold and Net Zero Energy. The work also includes delegated design such as, but not limited to Structural precast concrete garage, fire suppression system, Fire detection & alarm system, and photovoltaic panels. The new library work includes but is not limited to all typical building construction trade-work such as interior finishes, casework, equipment, mechanical systems/control/monitoring, plumbing, fire alarm/suppression, electrical, utility services, and related site work. Additional building features include a glass enclosed monumental corner, an outdoor plaza covered by a canopy, and a high-performance building envelope. Additional site features consist of a geothermal heating and cooling system, a Photo Voltaic (PV) solar panel structural support system on top of the precast garage, salvaging and reinstalling memorial benches, a bus shelter, and brick paver sidewalks. Due to the project’s site constraints, onsite storage will require careful construction sequencing and procurement/staging may require a significant level of off-site materials storage.