The work will consist of clearing and debris removal from approximately 0.14 AC of drainage easement, removal and replacement of approximately 12 SY of existing asphalt pavement, removal and replacement of approximately 33 SY of existing concrete driveway, removal of approximately 144 LF of existing storm pipe, installing approximately 882 LF of ADS HP stormwater pipe with one flared end section, installing approximately 400 LF of 6” underdrain, installing 16 yard inlets, grading swales in drainage easements and road rights of way and installing and maintaining associated erosion control measures. The contractor shall also be responsible for all testing and inspections and for providing appropriate traffic control measures until construction has been completed. The project area is located in the Kelly Street right-ofway and adjacent drainage easements provided by the City of Pooler. All work shall occur within designated road right of way and drainage easements.