The City of Ocala Electric Utility is seeking Contractors for a stand-by contract to provide emergency tree trimming and power line clearing services as a result of major weather-related events within the service territory of Ocala Electric Utility (OEU). Work is typical right-of-way clearing services (tree, vegetation, etc.) on electric utility power lines including distribution, transmission, and substation systems. Contractor to provide all labor, equipment, and materials required to successfully complete the work under OEU’s direction and specifications. OEU will provide meals and lodging while on site. Other costs as specified in Contractor’s travel policy (mobilization, travel, per diem, etc.) will also be covered by OEU (receipts required).