6000 PSI SERVICE 1. The breathing air station shall be supplied on a steel base frame of welded construction. The frame shall be designed for both the static and dynamic loads of the system and of sufficient size to adequately accommodate all of the station’s components. The base frame shall include four brackets to facilitate securing the leveled unit to a concrete floor using expansion anchors. The compressor, purification system, and all tubing shall be incorporated into an appliance-like enclosure complete with sound attenuation. The enclosure panels shall be equipped with a slamaction latches and lift-off hinges making it simple to facilitate inspection and maintenance. The enclosure and base frame shall be finished with a baked on polyester powder coat paint for the ultimate in durability, corrosion resistance, and long life. Space is extremely limited. The unit must not exceed, 55” L x 35” W x 70” H. 2. The station shall be designed for against-the-wall installation, operation, maintenance and singlepoint operator control from the front of the station. The design of the station shall permit unrestricted cooling air flow to the compressor and motor when installed against a wall. All system instrumentation, controls and access to the containment fill station shall be located at the front of the station. The compressor package shall fit through a standard 36” doorway. The station shall be designed for continuous duty operation indoors with room temperatures ranging between 40°F and 115°F. Installation shall not require a special foundation; however, it is the responsibility of the purchaser to ensure the installation site has a solid and level foundation that can support the weight of the station, the availability of a qualified source of air for the intake of the compressor and adequate ventilation. 3. All piping and tubing shall be properly supported and protected to prevent damage from vibration during shipment, operation, or maintenance. Piping and tubing shall be installed in a neat and orderly arrangement, adapting to the contours of the station. All instrument tubing shall be 300 series stainless steel. 4. The station shall be warranted free from defects in material and workmanship for a period of 60 months from date of start-up. The warranty shall not impose limitations on the station’s accumulated operating hours during the warranty period.