The contractor shall provide all materials, tools, machinery, labor, and supervision necessary for the construction of the Northwest Convenience Center. Construction shall include clearing and grubbing, erosion and sediment control permitting (NDPES Construction General Permit) and implementation, stormwater improvements, on-site soil borrow area development, structural filling, gravel and paved roadways, concrete retaining wall and pads for solid waste and recycling compactors, electrical service, compactor power and site lighting, attendant building, site stabilization, fencing and gates, traffic control, and ancillary work. Compactor and hopper supply and installation will be by others, Contractor shall coordinate. More specifically the work includes, but is not limited to the following items and quantities: 4.30 AC Clearing and Grubbing 1 LS Construction Entrance 1600 LF Silt Fences and Outlets 1750 LF Tree Protection Fencing 2300 CY Topsoil Recovery and Stockpile 8400 CY Soil Excavation to Roadway and Site Subgrade 8350 CY Structural Fill of On-Site Soils 2000 CY 6” Topsoil Installation 1 LS Wet Pond Construction and Outlet Structure 1 LS Fine Grading and TRM Lined Drainage Swales 6 EA Stone Check Dams 6 EA Sediment Tubes 1550 SY Erosion Control Matting 70 LF 12” RCP Culvert 70 LF 24” RCP Culvert 52 LF 30” RCP Culvert 5300 CY Roadway Select Subgrade Fill from Off-site Soils 365 SY Asphalt Roadway 6925 SY Gravel Roadway and Pad 550 SY Gravel Maintenance Road 180 CY Concrete Retaining Wall 68 CY Concrete Compactor Pads 1 LS Electrical Service 1 LS Communication Service 10 EA Site Lights and Connections 1260 LF Chain Link Fencing 3 EA 16’ Swing Bar Gates 1 LS Attendant Building