STP-15-1(118) W Jct. US-6 South 13426 N-4 - 132.58 to 133.58 N-15 - 22.14 to 45.21 Yes Yes Yes 1273 1559 STD Plan 921 [Flagging] N-4 - Expect 14" of AC on SABC. N-15 - Expect 14" of AC on SABC. N-4 - TW 3' LT&RT to a depth of 8". Mill 4" of existing AC. Fill trench and place 4" of SPR across 28' top. N-15 - TW 3' LT&RT to a depth of 8". Mill 4" of existing AC. Fill trench and place 4" o SPR across 28' top. N-4 - Core at 133. N-15 - Core at 22.16 in NB Fly By Lane, 22.16 in SB Turnlane, 22.5, 23, 24, 25, 26, 27, 28, 29, 30, 31.2, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45. Total Cores = 27 STP-HSIP-S55G(107) Hickman Spur 13512 S-55G - 0.00 to 3.41 Yes Yes Yes 2100 STD Plan 921 [Flagging] Expect 8.5" of AC on SABC from RP 0.00 to RP 3.09. Expect 5.5" of AC on 9"-7"-9" x 20' of PCC with 13.5" x 2' of AC widening from RP 3.09 to RP 3.41. S-55G - RP 0.00 to RP 3.09 TW 3' LT&RT to a depth of 8". Mill 4" of existing AC. Fill trenck and place 4" of SPR across 28' top. - RP 3.09 to RP 3.41 PCC Repair. TW 3' LT&RT to a depth of 8". Mill 4" of existing AC. Fill trench and place 4" of SPR across 28' top. Core at 0.5, 1, 2, 3, 3.2, 3.3. Total Cores = 6 Do not perform FWD or GPR from RP 3.09 to RP 3.41. *Note whether AC is bonded to underlying PCC. STP-79-2(116) Valparasio - N-92 13520 N-79 - 13.57 to 22.47 Yes Yes Yes 1236 STD Plan 921 [Flagging] Expect 12.5" of AC from RP 13.57 to RP 13.96. Expect 10.5" of AC from RP 13.96 to RP 22.47. N-79 - TW 3' LT&RT to a depth of 8". Mill 4" of existing AC. Fill trench and place 4" of SPR across 28' top.