The Contractor shall remove and dispose of existing Smith & Loveless equipment at both Wicomico Shores #1 and #2 WWLS locations and install new Owner provided Smith & Loveless, Incorporated (Smith & Loveless) pump packages, Kohler generators, and ASCO transfer switches in same locations. The Contractor shall perform all plumbing, sealing, and installation in accordance with the Smith & Loveless Pump Drawing and Installation Details without interruption to existing wastewater flow. Both existing Concrete Wet Wells shall remain. The COR or designated representative and Contractor shall inspect the wet wells for cracks, leaks, and integrity before, during, and after completion of construction. The Contractor shall load and transport the new Smith & Loveless packages from Wicomico Treatment Plant 35695 Golf Course Drive Mechanicsville Md. 20650 and generators from Hollywood Water Tower 24501 Three Notch Rd Hollywood Md 20636 to the respective WWLS locations and is responsible for all mechanical and electrical disconnections and reconnections. All Work must be scheduled and coordinated with the COR or designated representative during the entire performance period.