The scope of work includes construction of a new submersible transfer lift station at the Bryan County Wastewater Treatment Plant at Waterways in Richmond Hill, GA. Work shall include; demolition and abandonment of the existing pump station and gravity sewer system, installation of a 20’ by 12’ pre-cast concrete wet well structure, new sanitary sewer gravity pipes and manholes including approximately 95 LF of 18” PVC and 60 LF of 4” PVC, installation of two 85 HP submersible pumps and two 5.5 HP submersible pumps and all related piping, installation of pump discharge force mains including approximately 230 LF of 12” DI pipe and 170 LF of 4” DI pipe, installation of one 12” magnetic flow meter and one 4” magnetic flow meter, and installation of a gravel access drive.