Vanden High School: 7..1. Remove three existing boilers and replace with new RBI Futera II boilers, 1950 MBH, or equivalent boilers or larger, approved by the District. 7..2. Modify piping to accommodate new boilers. 7..3. Boilers shall be secured to existing concrete pads. 7..4. New Boiler blending/primary pumps adequate for new boilers shall be installed, approved by the District. 7..5. New expansion tanks shall be installed, approved by the District. 7..6. New flue pipes shall be installed (flue pipes shall be stainless steel). 7..7. New temperature gauges and new isolation valves shall be installed. 7..8. Bidder shall be responsible for lawful disposal of the removed boilers and waste materials. 7..9. Replace secondary pumps and motors with new Bell & Gossett series e-80 pumps. New pumps and motors shall be compatible to operate with the currents VFD’s. Golden West Middle School: 7..1. Remove Two existing boilers and replace with new RBI Futera II boilers, 1950 MBH, or equivalent boilers or larger, approved by the District. 7..2. Modify piping to accommodate new boilers. 7..3. Boilers shall be secured to existing concrete pads. 7..4. New Boiler blending/primary pumps adequate for new boilers shall be installed, approved by the District. 7..5. New expansion tanks shall be installed, approved by the District. 7..6. New flue pipes shall be installed (flue pipes shall be stainless steel). 7..7. New temperature gauges and new isolation valves shall be installed. 7..8. Bidder shall be responsible for lawful disposal of the removed boilers and waste materials. 7..9. Replace secondary pumps and motors with new Bell & Gossett series e-80 pumps. New pumps and motors shall be compatible to operate with the currents VFD’s. Scandia Elementary: 7..1. Remove Two existing boilers and replace with new RBI Futera II boilers, 750 MBH, or equivalent boilers or larger, approved by the District. 7..2. Modify piping to accommodate new boilers. 7..3. Boilers shall be secured to existing concrete pads. 7..4. New Boiler blending/primary pumps adequate for new boilers shall be installed, approved by the District. 7..5. New expansion tanks shall be installed, approved by the District. 7..6. New flue pipes shall be installed (flue pipes shall be stainless steel). 7..7. New temperature gauges and new isolation valves shall be installed. 7..8. Bidder shall be responsible for lawful disposal of the removed boilers and waste materials.