The contractor will be responsible for traffic control, reclaiming, grading, paving and final landscaping which includes topsoil, seed and fertilizer along the edge of the finished road. 2021.501 Mobilization 1 LS 2101.502 Clearing per tree 3 Each 2101.502 Grubbing per tree 3 Each 2101.505 Clearing 0.1 Acre 2101.505 Grubbing 0.1 Acre 2104.503 Remove Curb & Gutter 260 LF 2104.503 Sawing Bituminous Pavement (Full Depth) 925 LF 2104.503 Sawing Concrete Pavement (Full Depth) 40 LF 2104.518 Remove Concrete Pavement 720 SF 2105.607 Common Excavation 157 CY 2105.607 Common Borrow 397 CY 2123.510 Dozer 50 Hrs* 2215.504 Bituminous Pavement Reclamation Full Depth 25450 SY 2331.607 Haul Bituminous Pavement Reclamation 405 CY 2357.506 Bituminous Material for Tac Coat 1445 Gal 2360.509 Type SP 12.5 Wear Crs Mixture (2,B) 2800 Ton* 2360.509 Type SP 12.5 Non-Wear Crs Mixture (2,B) 3500 Ton*