1 CONTRACTOR CONSTRUCTION STAKING 1 LS $0.00 2 TRAFFIC CONTROL 1 LS $0.00 3 EROSION CONTROL 1 LS $0.00 4 REMOVAL OF EXISTING STRUCTURES 1 LS $0.00 5 PAVEMENT REMOVAL 9,500 SY $0.00 6 REMOVE LARGE TREES 2 EA $0.00 7 6" UNDERDRAINS 341 LF $0.00 8 8" AGGREGATE BASE - TYPE AB-3 24,492 SY $0.00 9 6" CONCRETE DRIVEWAY (RESIDENTIAL) 397 SF $0.00 10 8" CONCRETE DRIVEWAY (COMMERCIAL) 12,437 SF $0.00 11 4" PATTERNED COLORED CONCRETE PAVEMENT 979 SF $0.00 12 GEOTEXTILE FABRIC 24,492 SY $0.00 13 COMBINED CURB AND GUTTER, TYPE I 44 LF $0.00 14 COMBINED CURB AND GUTTER, TYPE II 6,101 LF $0.00 15 COMBINED CURB AND GUTTER, TYPE III 93 LF $0.00 16 4" CONCRETE SIDEWALK 14,347 SF $0.00 17 6" CONCRETE SIDEWALK 20,891 SF $0.00 18 SIDEWALK RAMP 2,726 SF $0.00 19 MULTI-LAYER POLYMER CONCRETE OVERLAY 1,330 SY $0.00 20 PAVEMENT MARKING (THERMOPLASTIC)(WHITE)(4 INCH) 1,894 LF $0.00