Mobilization and demobilization; traffic control and construction signage; coordination with USA for utility markings, removal and replacement of traffic striping, marking, and markers; removal of asphalt dikes, removal of storm drainage culverts, removal of asphalt walkways, removal of gravel driveways, clearing and grubbing, remove fences, remove cattle guards, roadway excavation, common excavation removal of pavement and base material, removal of subbases, asphalt grinding, native material fill, construction of new concrete curb and gutter, sidewalk, driveways, driveway conforms, median islands, curb ramps, retaining curbs, hot-mix asphalt (HMA) pavement, base material; storm drain improvements; utility relocations, new 8” sanitary sewer force main, new 14" sanitary sewer force main, relocation of existing 14” sanitary sewer force main, relocation of 24” Ductile Iron water main, new 20" Ductile iron water main, valves, fire hydrant, and appurtenances, corrosion protection, welded steel pipe at new water main crossing sanitary sewer mains, adjustment of water valves and corrosion valve boxes, PG&E gas line coordination, providing traffic control for utility companies for relocations, traffic signal, street lighting, signing and striping, planting and irrigation, bioretention areas, coordination with PG&E for new electrical service, encroachment permits from City of Oakley, coordination with adjacent property owners, coordination with PG&E gas and Electric, AT&T, Comcast, coordination with other work as shown on the Contract Plans, as specified in the Contract Documents, and as directed by the City Engineer.